Wednesday, 23 April 2008

One year old today

According to my records, it's a year today that my plywood arrived and I scribed my first mark on what is to become Johanna.

The time seems to have flown past, and I've learned an awful lot in that period. If I were to start again, I'd probably do some things differently; but that's what comes from experience.

Unfortunately work has stalled for a while whilst I recuperate from some surgery, but I'm looking forward to the warm weather and hopefully some pretty rapid building progress in the months to come.

The plan is to finish and paint the interior, get the decks on, sheath the hull and then finish off the cabin top. Hopefully all that will be done during the summer months. Time will tell....

Johanna, one year on.

Sunday, 2 March 2008

It's March Already!

Doesn't time fly?

My Paradox is now 10 months into build, but it seems like the last 5 have seen little progress. Slow and steady progress however goes on behind the scenes.

Nothing however as fast as the Jimmy Lu's build in Taiwan. A big congratulations to Jimmy on the completion and launch of his Paradox "Auspice"

Back here at home I've been working mainly on the internal features.

  • Cabin soles cut to size
  • side shelves installed
  • filleting of bulkheads and floor members
  • building cabin top and hatch beams
  • installation of carlins
  • installation of intermediate deck beams
  • fairing of sheer and deckbeams for decking.

Not much to see (other than sawdust and shavings) but I'll post a few pictures anyway, taken this afternoon.

Cabin soles and side shelves

Aft stowage

Water!

More Water!

Carlins and sheer fairing

Foredeck trial fit

Sunday, 6 January 2008

Happy New Year

Johanna was turned "right side up" on New Years Day, ready for some more building action.

The cold, wet and dark days, along with Christmas and New Year festivities, meant nothing much has been done over the last month.

Johanna was turned "right side up" on New Years Day, ready for some more building action.

The cold, wet and dark days, along with Christmas and New Year festivities, meant nothing much has been done over the last month.

I decided to wrap up well today and proceeded to make cardboard templates for the side shelves and breast hook. These were then cut out from 12mm ply and finally trimmed to fit. It's really too cold at the moment to epoxy, so I'll continue making and preparing similar small items ready for installation once the weather warms up. Roll on the spring!

Sunday, 25 November 2007

Rudder and Stock

With the hull at a standstill until I turn it over, I made a start putting together the rudder and stock.

Both units were cut out and laminated together, and I've now started shaping the blade. This will keep me busy for a while, but hope to turn the hull right side up, probably next weekend.

Rudder and Stock

Shaping the blade

Sunday, 4 November 2007

Chine Runners fitted

"Johanna" is now six months into construction and her hull is now watertight and float-able!

I finished fitting the chine runners this weekend; they just need a final sanding and they'll be ready for glassing. I may leave this until the spring as the short days and cold nights are not ideal for sheathing at the moment. I'll probably turn the hull over and continue work "right side up"

It was a nice sunny day today, so I took the opportunity to tidy up a bit and take a couple more photos without all the junk onboard!

I've got a bit bored with looking at the boat upside down, so I flipped her for an underwater view!

Tuesday, 30 October 2007

Bottom fitted

It's been a few weeks since I posted here but I have been working quietly behind the scenes.

The bottom panel was fitted in place over the weekend of October 13th and 14th. It continued to live up to it's name as the "Beast from the East" and gave me a a few worrying moments. I enlisted the help of my son to help me mix the vast quantities of epoxy it consumed, as I found it difficult to mix large quantities fast enough. When I eventually got the bottom fitted I put a light under the boat and was horrified to see light shinning out along part of the chine join. I ended up having to prise the bottom off, mixing yet more epoxy and then climbing on top of the boat and walking along the bottom as I fastened it down with sheet rock screws. What I thought would be a couple of hours work turned into a 6-8 hour marathon.

Bottom On!

The following weekend was spent trimming and shaping the bottom. Once again this turned into a long job. That 18mm ply is tough stuff.

This past weekend I made a start at gluing in the chine runners and making a start at shaping them. I have the port runner in place and all it needs is a bit more shaping and a final coat of fairing compound and rub down to finish it off. I'm working on the starboard runner but won't really get far with that until the weekend.

Chine runner

Tuesday, 9 October 2007

Chine Runners

Well "Johanna" is still bottomless, but I've been working behind the scenes preparing for the final fitting.

I explored several possibilities on the best (easiest!) way to fit the chine runners. I have eventually decided on the following approach.

Initially I thought about roughly shaping the entire runner, bonding it to the hull and fairing off the top to match the chine logs. This would mean that I could then fit the bottom and the job would be more or less complete, bar the final sanding and shaping. When I came to do this I realised just how difficult it was to bend the runners to conform to the hull. My thoughts on it being easy to clamp evaporated because all the clamps did, was deform the "sharp" edge of the runner. Taking a hint from Jack Gardiner on the Paradox builders group I cut the runner into smaller blocks approx 150mm length and temporarily screwed them to the chine.

Chine runner "Blocks"

Blocks screwed to chine

I then faired the top (bottom) of the blocks to match the line of the chine logs.

Blocks being faired

At this stage I was prepared to glue all the blocks and fit the bottom panel. However my approach will now be to remove the blocks (they're all marked and numbered for easy repositioning), fit the bottom panel, glue the individual blocks back in place then shape and fair the runners. My main reasons for this order of construction is so that I can accurately measure the offset of the runners from the hull side. This would not be so easy if the runners were already in place. Also I have already built a drilling jig to mark the position of the ringnails in the centre of the chine logs. This relies on the jig fitting against the hull side, something else I would have to change if the runners were in place. Apart from all that, I was down to only 1 litre of epoxy. Now I'm pretty sure that that is more than enough to fit the bottom, but once I start it will be too late to find out if it isn't! I've had a delivery of another 9 litres today so we should be on a roll again. With luck I may have the bottom fitted this weekend.