I've not been idle, but there's not a lot of progress to report. The  baffle cleat on the transom is installed after a lot of head scratching  as to the best way to cut and bevel it. All cleat bevels are now  complete and the entire hull has been temporarily assembled using  screws. All the holes have been drilled for the ring nails and ready for  final glue up.
 At the weekend I built a trolley to keep the boat on. This uses four  heavy duty  swivel castors which allows me to move the boat around  easily in the confines of my boat shed. It also allows me to bring the  boat outside to work on when the weather is agreeable.
 
  
 Work on the vent trunk continues; when that's complete I'll be in a position to wet assembly.
 
No comments:
Post a Comment