Sunday, 31 August 2008

August Update

I've just a few hours of the month left to squeeze in an update for August.

As usual every time you think you're ready for the next stage, you find a hundred little things that need doing! I'm still working towards getting the decks fitted, and in fact they are all cut and internally coated with epoxy, but I want to make sure that as much of the internals as possible are finished before I proceed.

Two jobs that needed completing were the installation of the steering lines and the tiller port transom opening. The steering lines are fairly straight forward and quickly sorted out.

Steering lines trial fit.






































Next job was the tiller port opening in the transom. This was a bigger job as it means hanging the rudder first to accurately measure the port opening. Of course this couldn't be done without manufacturing the lower gudgeon. To do this I made a mould (or form) out of scrap Styrofoam left over from the hull insulation.

Create gudgeon mould























Cut out shape of gudgeon and discard!





















The resulting mould was firstly coated with thickened epoxy/cabosil mixture. I then added six layers of wetted out glass cloth and pressed firmly to walls. A large plastic bag was then placed in the mould and filled with hot water. This helped hold the glass in position whilst curing, squeezing out excess resin through a slot in the bottom of the mould - a poor mans vacuum bag system. Once cured enough I continued to fill the mould with chopped glass, with occasional layers of biax cloth. It was as this process came to a finish that the smoke started to rise as the moulding became red hot. I ended up ripping the foam mould off so that I could immerse the smoking gudgeon in a bucket of water. I therefore have no pictures of the moulding in progress!

Fresh from the mould











































The gudgeon has now been drilled for fitting and also given a light coating of microballons which will be sanded to a smooth finish. All in all I'm very pleased with the result.

Wednesday, 30 July 2008

July Update

I've been busy with lots of things this month, but unfortunately not a lot of boat building.

I'm very nearly ready to fit the decking, I just have a few bits of paint work to finish off and a few small gluing jobs to finish.

The vent trunk is now more or less complete (one of the painting and gluing jobs).

I decided to make an access hatch in the starboard side panel. Some others have made the whole panel removable, others have glued it permanently in position.

Side panel access

Johanna almost ready for decking.

Wednesday, 18 June 2008

What's Cooking?

So, what's cooking? All will be revealed!

Take a piece of dowel and slice into 20mm lengths.

Take one piece of styrofoam and cut to size.

Measure carefully and make recess in rear of foam to accommodate dowel plugs.

Position/mark and glue plugs to hull side.

Cut battens to length of foam pieces.

Place prepared foam over dowel and affix with battens.

Voila - foam installed! 1 down 13 to go........

After all that and some paint and varnish we're getting closer to getting the decks installed.

Wednesday, 11 June 2008

Summer is here

We've had a few hot sunny days here, and now it's too hot to work on the little boat!

Just so you don't think I've abandoned the project, or the blog, I'll post the latest update.

  • Bulkheads now painted
  • Side bins varnished
  • Lazarette bins installed
  • Foam installed to hull sides

The later has taken up quite some time as I devised a means of making the foam removable for inspection/winter storage.

I'll post pictures and further details shortly.

Wednesday, 23 April 2008

One year old today

According to my records, it's a year today that my plywood arrived and I scribed my first mark on what is to become Johanna.

The time seems to have flown past, and I've learned an awful lot in that period. If I were to start again, I'd probably do some things differently; but that's what comes from experience.

Unfortunately work has stalled for a while whilst I recuperate from some surgery, but I'm looking forward to the warm weather and hopefully some pretty rapid building progress in the months to come.

The plan is to finish and paint the interior, get the decks on, sheath the hull and then finish off the cabin top. Hopefully all that will be done during the summer months. Time will tell....

Johanna, one year on.

Sunday, 2 March 2008

It's March Already!

Doesn't time fly?

My Paradox is now 10 months into build, but it seems like the last 5 have seen little progress. Slow and steady progress however goes on behind the scenes.

Nothing however as fast as the Jimmy Lu's build in Taiwan. A big congratulations to Jimmy on the completion and launch of his Paradox "Auspice"

Back here at home I've been working mainly on the internal features.

  • Cabin soles cut to size
  • side shelves installed
  • filleting of bulkheads and floor members
  • building cabin top and hatch beams
  • installation of carlins
  • installation of intermediate deck beams
  • fairing of sheer and deckbeams for decking.

Not much to see (other than sawdust and shavings) but I'll post a few pictures anyway, taken this afternoon.

Cabin soles and side shelves

Aft stowage

Water!

More Water!

Carlins and sheer fairing

Foredeck trial fit

Sunday, 6 January 2008

Happy New Year

Johanna was turned "right side up" on New Years Day, ready for some more building action.

The cold, wet and dark days, along with Christmas and New Year festivities, meant nothing much has been done over the last month.

Johanna was turned "right side up" on New Years Day, ready for some more building action.

The cold, wet and dark days, along with Christmas and New Year festivities, meant nothing much has been done over the last month.

I decided to wrap up well today and proceeded to make cardboard templates for the side shelves and breast hook. These were then cut out from 12mm ply and finally trimmed to fit. It's really too cold at the moment to epoxy, so I'll continue making and preparing similar small items ready for installation once the weather warms up. Roll on the spring!